This week I decided that the next step I should take in my project is a shooting schedule. I haven't reached out to actors yet, but I want to try and get most of the filming done on 3/23 or 3/24. This gives me enough time to make sure that I have all of the actors and necessary equipment that I need. If I am not able to film on 3/23 or 3/24, that whole following week is spring break so I can probably organize another time to shoot. I hope the weather allows me to film, as most of my scenes are filmed outside.
Subscribe to:
Post Comments (Atom)
Final Project
The final project can be viewed by clicking on the hyperlink below. DROPS (Youtube) DROPS (Google Drive)
-
It just came into my mind that I have not really thought about set design or props at all. So today, I want to go through everything I ne...
-
Today I spent the majority of class trying to get actors to be in my opening. I've been reaching out to kids that I know can act, whe...
-
So I took a day off from editing, and then came back and watched the whole thing. I spotted some small details that needed some tweaking ...
No comments:
Post a Comment